Our largest Modern Shed structures are a true investment in your property and lifestyle. We take great pride in providing a premium experience along the way, and as such, these projects take a measured amount of time longer than a less complex un-permitted structure. While the quality of all our Modern Shed projects is always held to the highest standard, the planning process is much more comprehensive, often requiring deeper levels of customization for our clients. Please allow a minimum of 9-20+ months (estimates based on actual projects). Click More to view each individual step and the anticipated timeline.
Planning and building a structure requiring a building permit is broken into 6 steps:
- Design: Designing a full-blown ADU vs an oversized office, both requiring a building permit vary widely. We offer both services. Allow a minimum of 2-4 weeks. There is a design fee for these services. You may also employ your own designer or architect.
- Drafted plan sets: Our draftsman can create (charged separately) a set of plans required for engineering and permit acquisition. Allow a minimum of 3-4 weeks.
- Engineering: We can provide to you, structural engineering requirements for permitting with a wet stamp set of plans. Allow a minimum of 3-6 weeks.
- Pricing: Even though all our structures are built to base IBC (international building code) specifications, each jurisdiction may still require engineering and wet stamp and may cause certain add-on or changed items within the building envelope based on design and specific geographic location. Therefore, our structures are ALWAYS repriced after engineering. Allow a minimum of 2 weeks.
- Fabrication: Once you have signed off on updated pricing and plans, fabrication can take anywhere from 6-16 weeks depending on availability of materials (especially doors and windows).
••Installation: Due to the nature of a larger structure, delivery and installation costs are considerably higher than smaller non-permitted structures. Larger structures may require full semi-truck delivery with forklift for example. All jurisdictions require a licensed general contractor or homeowner/contractor of record. This person is responsible for all aspects of installation after the Modern Shed material package is delivered. This includes but is not limited to, unloading, staging, groundwork, foundation, trenching, assembly of the Modern Shed, electrical, plumbing (if needed), interior finishes including sheetrock, flooring, paint, cabinetry, etc.. It is highly recommended that you establish firm contractual agreements with your contractor of choice. Modern Shed is in no way responsible for any work done by any contractor, whether recommended by anyone at Modern Shed or not. Allow a minimum of 4-12 weeks (depending on size and availability of inspectors).